Product description
Working principle:
The shearing machine produced by Henan Yuantong Heavy Industry is equipped with an automatic feeding box as standard, that is, after the material is grabbed to the feeding box, the waste is automatically sent to the cutting edge by the conveyor belt, and the feeding speed can be adjusted by the speed control motor. . Side squeeze cylinders can be equipped on both sides of the material box. If large waste materials such as scrapped cars cannot be cut through the gantry shears, the side squeeze cylinders can be used to squeeze the waste to the cutting edge. Yuantong gantry shears have a large shearing capacity, which is suitable for large-scale waste processing in large-scale waste collection stations. Commonly used specifications are 500 tons/6000 (6 meters feeding table), 800 tons/6000 (8 meters feeding table), 1000 tons/10000 (10 meters feeding table), which are used for cutting various scrap metals. They are used in rolling mills and non-ferrous metals. Ideal equipment for charge processing in metal plants and smelters.
Technical parameter
Technical Parameters:
Model | Shear Force (t) | Blade length (mm) | Shear Frequency (times/min) | Total power of equipment (KW) | System working pressure | Dimensions (mm) |
Q91Y-315 | 315 | 1200 | 3-5 | 60 | 31.5Mpa | 4000*1700*2800 |
Q91Y-400 | 400 | 1500 | 3-5 | 80 | 31.5Mpa | 8500*2100*3800 |
Q91Y-500 | 500 | 1600 | 3-5 | 120 | 31.5Mpa | 9000*2500*4000 |
Q91Y-630 | 630 | 1600 | 3-5 | 180 | 31.5Mpa | 9500*2600*4200 |
Q91Y-800 | 800 | 1800 | 3 | 200 | 31.5Mpa | 11500*2800*4450 |
Q91Y-1000 | 1000 | 2000 | 3 | 260 | 31.5Mpa | 12000*3100*5500 |
Q91Y-1250 | 1250 | 2200 | 3 | 320 | 31.5Mpa | 14000*3300*6000 |
For more please contact: 13949059555 zzytjx@163.com |
Precautions for starting the metal hydraulic gantry shearing machine
1. Start the hydraulic gantry shearing machine for a few cycles of idling to ensure that under normal conditions, try to cut sheets of different thicknesses, from thin to thick. Ensure that the user is familiar with the performance of the shears.
2. It is necessary to adjust the gap of different blades when the thickness of the plate is different during the trial cutting. If the corresponding blade gap is not adjusted, the durability of the blade will be affected.
3. Turn on the pressure gauge switch during the cutting process of the hydraulic gantry shearing machine and observe the pressure value of the oil circuit. The pressure should be less than 20MPa when cutting a 12mm plate. This remote pressure regulating valve No9, the pressure is set to 20-22MPa when leaving the factory, the user needs to comply with this regulation, and the material that exceeds the specified thickness and cannot be cut can not be cut, causing damage to the machine.
4. Sound balance during operation. If the hydraulic gantry shearing machine has noise, stop and check.
5. When the hydraulic gantry shearing machine is operating, it will shut down and rest when the fuel tank temperature is 60 degrees.
FAQ
1. How many days do you need to produce this machine?
This is a machine specially designed and manufactured according to your specific requirements. From engineer design to production completion, it takes about 60 working days.
2. What does your factory do in terms of quality control?
We attach great importance to quality control and production from the purchase of steel plates to the final safety commissioning. Each machine will be fully assembled and carefully tested before shipment.
3. What is the quality assurance of your machine?
The quality assurance period is one year, and we choose components from world-renowned brands to keep our machines in ideal working conditions.
4. Can you install and debug abroad? How long will it take?
Yes, we provide overseas services, but you need to pay the engineer’s air ticket and hotel food expenses. Minicomputers usually take 10 working days, and mainframes usually take 60 working days.
Why choose Yuantong

• Henan metal crushing equipment manufacturer
• 10 years of professional production experience, the brand is trustworthy
• With independent production and processing centers, products are exported to more than 70 countries and regions at home and abroad
• Hundreds of front-line workers provide guarantee for product development and technological innovation
• With dozens of unique craftsmanship, it has been praised by "Customers are trustworthy"
• Advanced environmental protection spraying equipment to ensure the beautiful appearance of the equipment


• Professional service team to serve you and escort your production
• Safe and efficient logistics distribution center to ensure accurate and timely delivery of equipment
• Provide customers with free installation and commissioning and personnel operation training services
Online message
Popular reading
+86 13949059555